Proposed Implementation Strategy

  • Approximately 40 management actions are proposed
  • Actions are identified as on-going, short term, medium term or longer term
  • On-going actions may be initiated at any time and may continue for a period of time or throughout the whole timeline of the plan
  • Short, medium and longer term actions are generally planned in 5 year blocks and are subject to resources being available

The proposed actions are outlined in the Draft Management Plan section 7, Table 1 (pages 40-44).